
We – EPG Team the most significant gearbox & motors , couplings and gears manufacturing facility in China with 5 distinct branches. For much more specifics: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828
solution title:
jinlite best cost YE2 7.5kw a few-period asynchronous micro ac motor 160M-6 reducer motor
Item Description:
YE2 Sequence Forged of Iron 3 Phase Induction Motor is specifically created for European market place, whose terminal box is located on
the leading of motor.They are completely enclosed and supporter-cooling made. They are recently made in conformity with the pertinent
demands / guidelines of IEC&DIN42673 specifications.
| Sort | YE2 |
| Electrical power | .seventy five~315kw |
| Insulation | F / B, H/B |
| Voltage and frequency | 380/four hundred/415/660/690V 50/60hz |
| Velocity | 3000/1500/a thousand/750/600 rpm |
| Mounitng | IMB3/IMV1 |
| Cooling and ventilation | TEFC in accordance with IC411 of IEC60034-6. |
| Winding | one hundred% Cooper Wire |
| Protection class | IP54/IP55 |
| Vibration | vibration class A, vibration class B is available on request. |
| Quality assurance | ISO9001 |
| Site conditions | from -15°C t0 +40°C and altitude below 1000 meters |
packaging:
Business Demonstrate :
certification
Around the world Advertising & Service Network
World-wide Perfect Marketing service community is a single of jinlite motor’s benefit. we have forty branches in china principal town,8 branches in
the Abroad ,Our enterprise penetrates more than sixty nations and areas including South The usa, North The us,Europe, Asia
Middle East and Africa, Giving us speedy reach capability from product sales, support, procurement and Transportation since inception, Pinxing
always uphold the growth technique of market globalization. we segment and placement buyers demands and ept industry. our
goods and services are extensively utilized in global industry, and functionality stable and security.we custom different motors for distinct
industries
FAQ
Q: Do you supply OEM service?
A: Indeed
Q: What is your payment expression?
A: thirty% T/T in progress, 70% harmony when acquiring B/L copy. Or irrevocable L/C.
Q: What is your guide time?
A: About 30 days right after obtaining deposit or original L/C.
Q: What certifiicates do you have?
A: We have CE, ISO. And we can use.
The use of unique equipment manufacturer’s (OEM) component figures or emblems , e.g. CASE® and John Deere® are for reference reasons only and for indicating solution use and compatibility. Our business and the listed alternative components contained herein are not sponsored, authorized, or manufactured by the OEM.

