
Our business pays particular focus to customers’ wants, listening to the certain specifications of every buyer and guaranteeing total gratification. EPG will often adhere to it business spirit of being practical, progressive, productive and outstanding to make the best global transmission drive. Our experts and engineers have 23 a long time of Expertise in the Bearing Industry. High EPT Specialist Lathe EPT
For Turning Tyre Mould commaGrooves comma Flange commaEPT commaWheel comma Shaft commaTire Mould comma Railway Parts commaWheel Hub Turbine commaetc
1 interval OutstXiHu (West Lake) Dis.Hu (West Lake) Dis. Attributes colon
All factors of EPT are EPTed foreign renowned makes comma these kinds of as FANUC or SIMENS Handle Program sol SchneiEPTElectrical Control system comma Japanese NSK EPT comma ABB EPT amp EPT box solEPT box comma and many others time period We can also configurate for every buyer aposs EPT ask for and requires time period Our Engineers can design and style different configurations in accordance to different workpieces qualities period of time
1 period rpar This variety of lathe can be designed into CNC Milling Lathe which has functions of Milling and Turning comma incXiHu (West Lake) Dis.Hu (West Lake) Dis. screw thread comma conical surface area comma curved floor comma inner boring comma and many others time period
2 time period rpar This lathe adopts frequency handle technique as its primary EPT technique semi EPTn by frequency manage motor comma the speed of principal-shaft realizes stepless velocity regulating comma as a result possessing diverse speeds to satisfy rational cutting velocity requirements for the machining of various sort of perform-piece time period
3 period rpar This lathe is made up of lathe bed comma selective headstock comma tailstock comma blade adapter comma electric powered handle system comma lubrication method comma and so on period Selective headstock and tailstock are set up at the left and rigEPT side of lathe bed respectively interval
4 period of time rpar The primary shaft can recognize stepless velocity regulating in a selection of ten~300r solmin semi and the primary spindle front bearing adopts high-precision double row cylindrical roller bearings comma having large-degree of rigidity and rotary precision and effortless to modify period of time
5 interval rpar Large Rigidity comma Stability and EPT Upkeep colon All castings are manufactured of higher-toughness meehanite EPT250 period which is specifically appropriate for hefty reducing period of time All massive castings stand the examination of annealing and vibration aging and interior anxiety is removed comma so the overall precision is tremendously improved and processed parts are located with large geometric accuracy period of time
Our Theory colon MaXiHu (West Lake) Dis.mize Customer aposs Profitability unEPTthe minimum spend EPT time period
Customized Lathe is Our EPT Characteristics
Optional Variety colon
one period EPT comma Gear Box commaCNC Control Technique can be specified by consumer
two time period EPT Shield solFlash XiHu (West Lake) Dis.hu (West Lake) Dis. for EPT can be optional
Application colon This is a CNC horizontal roller lathe which is suitable for high-velocity metal and carbide slicing resource to implement coarse and good stock taking away and chopping on the outer cylindrical floor of roller of various resources semi it also can be utilized for rough and finish machining of other shaft elements period of time
two interval StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd EPT Parameters
| Name | CK61100 | CK61125 | CK61160 | CK61200 | CK61250 | |
| Description | Unit | |||||
| Max time period Swing in excess of mattress | mm | 1000 | 1250 | 1600 | 2000 | 2500 |
| Max time period Swing Above the skateboard | mm | 600 | 800 | 1200 | 1500 | 1800 |
| Max period of time WeigEPT of Function-piece | T | one | 1 | 2 | two | three |
| Max period of time Duration of Operate-piece | mm | seven hundred | seven hundred | 700 | seven-hundred | seven hundred |
| Gears of Spindle Velocity | sol | Infinitely Variable Speed solstep-significantly less speed | ||||
| Variety of Spindle Speed | r solMin | 10-three hundred | ten-two hundred | ten-a hundred and sixty | ten-one hundred sixty | 4-eighty |
| Chuck Diameter | mm | 800 | one thousand | 1250 | 1600 | 2000 |
| EPT Diameter of Main Entrance Shaft | mm | 190 | a hundred ninety | 220 | 220 | three hundred |
| X commaZ X commaZ-AXiHu (West Lake) Dis.s Feed Assortment | mm solMin | -3000 | ||||
| Horizontal Stroke | mm | five hundred | 650 | 800 | a thousand | 1250 |
| EPTitudinal Stroke | mm | seven hundred | 700 | seven hundred | 700 | 700 |
| Major Driving EPT | Kw | Variable Frequency 11Kw-4 | Variable Frequency 15Kw-four | Variable Frequency 22Kw-four | Variable Frequency 30Kw-4 | Variable Frequency 45Kw-four |
Rermarks colon
one interval The over 5 models of CNC Lathes are the stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd configurations comma we can also design and style and manufacture custom-made lathe according to the consumer aposs workpiece features interval
2 period This sequence horizontal Lathe EPTs have been exported to Norway comma TEPTd comma Romania comma Iran comma Russia comma Chile for machining railway elements comma car components comma mining and metallurgy comma transport creating comma wind EPT and other EPTry market time period
Overseas Buyer aposs Praise for our Product and Management
3 time period Following-sale Service and Upkeep
one period We supply skilled specialized instruction for users apos operators and routine maintenance employees to enable them to properly use and operate the lathe and carry out regular upkeep time period
two interval Warranty time period colon 1 yr following acceptance of the lathe period of time
three period In scenario of any good quality dilemma identified for the duration of operation comma the manufacturing unit will dispatch staff to the consumer aposs location inside forty eight several hours lpardomestic consumers rpar amp inside of 3 daEPT lparForeign Customer rpar and the specialized personnel received apost go away before resolving the malfuntion time period
4 interval The firm will freely supply different EPT and mechanical areas for the acquired lathe timely inside warranty period period
5 interval The business will supply life time assure for the consulting companies in terms of application comma servicing comma mend comma renovation comma and so forth of equipments interval
For far more details comma make sure you truly feel free to get in touch with us period Many thanks excl

