In addition, all our generation processes are in compliance with ISO9002 requirements. Our items are manufactured by contemporary computerized machinery and products. If you are fascinated in any of our goods or would like to go over a potential get, make sure you feel free to contact us.
one. Introduction
LoaEPTis a variety of earthwork development EPTry commonly employed in highways, railways, building, hydroEPT, ports, EPTs and other construction projects. It is mostly employed for shoveling bulk materials this kind of as soil, sand, lime, and coal, and can also be used for ore , Difficult soil, and so on. for ligEPT shovel and digging operations. Various auXiHu (West Lake) Dis.liary functioning products can also be utilised for bulldozing, lifting and other resources such as timber loading and unloading operations.
In the construction of roadways, eEPTly substantial-quality highways, loaders are utilised for filling and excavating roadbed functions, asphalt mixtures and aggregate and loading of cement concrete yards. In addition, it can also carry out operations this sort of as pushing soil, leveling the floor and pulling other EPTry. Since the loaEPThas the benefits of fast functioning speed, higher effectiveness, good maneuverability, and ligEPT operation, it has turn out to be 1 of the principal kinds of earth and stone building in engineering design.
2. Features:
*Weichai engine is adopted, with big torque backup and strong EPT.
*Single phase, 4 aspects, twin turbo ZL50 torque converter and planetary EPT from HangEPT Progress EPT Team, compact construction and higher trustworthiness.
*Equipment-shift with 2 EPT and one reverse managed by fleXiHu (West Lake) Dis.ble shaft eases much labor.
*Strengthened axles personal huge bearing capacities and substantial dependability.
*Twin pump merging EPT technique helps make decrease consumption and exceptional overall performance.
*The coaxes stream-amplified, EPT compensated steering can make operation simple and performance trustworthy.
*Each vacation technique and functioning EPT program are compelled-cooled, improving the efficiency naturally.
*Air more than EPT brake method 8-caliper disc brakes.
*Air split handle, broaden hoof variety parking brake and emergency brake.
*Large area articulated chassis can make operation and traveling stable.
*Operating device with routinely leveling capacity at substantial situation.
*Main articulated factors get sealed, lubricated, dust-evidence layers, which owns great longevity.
*Integral, luxury instrument board.
*EPT, luxurious cabin.
three. parameter
Performance |
one | Rated load | 6000kg |
2 | Overall weight | 19200kg | |
three | Rated capacity | 3.5m3 | |
4 | Max. Tractive drive | 170KN | |
5 | Max. Breakout pressure | ge190KN | |
6 | Max. Quality capacity | thirty deg | |
7 | Max. Dumping peak | 3100mm | |
8 | Max. Dumping reach | 1250mm | |
9 | General dimension L x W x H | 8160x3070x3400mm | |
ten | Min. Turning radius | 6630mm | |
Motor |
eleven | Design | Shangchai CAT SC11CB240.1G2B1 |
twelve | Kind | Inline/Turbocharged/water cooling | |
thirteen | No. Of cylinder-bore/stoke | six-121x152mm | |
14 | Rated EPT | 175kw-2200r/min | |
15 | Max. torque | 950N.m | |
16 | Min. Fuel-consume ratio | le215g/kw.h | |
EPT | seventeen | Design | ZF tech 4WG180 EPT |
eighteen | Gear shift | 4 EPT, three reverse. Digital management EPT change |
|
19 | Max. velocity | 38km/h | |
Travel axle |
twenty | Main minimizing spiral | EPTl EPT grade one reduction |
21 | Decelerating method | Planetary reduction, grade one. | |
22 | Wheel base | 3200mm | |
23 | Wheel tread | 2250mm | |
24 | Min. ground clearance | 510mm | |
EPT technique | 25 | System operating stress | 18MPa |
26 | EPT lifting time | 6. .2s | |
27 | Overall time | twelve .5s | |
28 | Gas tank ability | 300L | |
29 | Leveling immediately | Yes | |
Break program | 30 | Service brake | Air more than EPT disc brake on four wheels |
31 | Parking brake | broaden hoof sort | |
Tyre | 32 | Type | 26.5-25 |
33 | Entrance tyre strain | .4Mpa | |
34 | Rear tyre pressure | .35Mpa |
4. Optional
966 Wheel Loader
Shangchai CAT tech engine (175KW),6BTA5.eight-C150,WG180 and electronic handle EPT change, EPTstick control, air issue, new luxury cabin.
OPTIONALS:
#8226 ZF EPT Gear Box (Design WG180)
#8226 EPT EPTstick Handle
#8226 Air Conditioner
#8226 EPTstick
5. Assure time period:
one year
Delivery period of time: thirty days
Payment terms: T/T.
EPT: one unit disassembled, bare in one x 40HQ container.
HS Code: 8429510000
6. Apps
seven. EPT component source
8. Delivery time:
Supply time: thirty functioning days
nine. Providers
EPT Direction:
one. Offer the movie for technological direction
two. Manufacturing unit ship technician to agent country for complex direction a few times for each calendar year
three. Agent also could send out technician to our manufacturing facility to learn EPT
Instruction Help:
one. Provide the video clip for training
2. Manufacturing unit send technician to agent region for training 3 times per calendar year
3. Agent also could send out technician to our manufacturing unit to learn EPT
Right after-sale Services:
Manufacturing facility provide one 12 months or 2000 several hours following sales services in globally, Agent shall offer neighborhood experts and staffs to fulfill the management , procedure and instruction of soon after sale services, and give workshop, warehouse, business office and other faXiHu (West Lake) Dis.Hu (West Lake) Dis.ties to support a sustained right after sale services.